To choose the right PowerLink hybrid system, first match the battery capacity (kWh) and power output (kW) to your site’s average and peak loads to ensure it can handle heavy equipment start-ups.
Assess your primary energy goal – our experts will be happy to match your goal with the appropriate system.
Verify the availability of renewable inputs like solar to maximise the EMS-driven fuel savings, ensuring the built-in generator is only used as a secondary backup.
Finally, consider environmental factors, such as harsh, high-temperature sites, to maintain long-term battery health and ensure reliable operation.